Current Projects

What we have done

Modernization

In Malaysia many buildings occupied with old lift system. Which is always giving breakdown and inconveniencing to the passengers.

Beside that the old controller consume high current which is burden to the owner to pay high electricity every month. Furthermore the old system never carry some important safety such as Double Lock Device, E-BOPS, Lightening and Surge Protection and so on. On top of this the old controller system is very rough and the riding comfort not smooth as new controller.

There are some job site already done modernization by RK Elevator as per attach behind

Highway Center – Before Modernization

Highway Center – After Modernization

Kompleks Sukan Rakan Muda Wilayah Persekutuan,KL

Full Modernization with traction machine & Controller. Complete designed by RK Eric Silan

Home Lift Dr. Khairul

Home Lift installation in progress at Bangi ( Dr. Khairul ) High Quality MRL Home lift

Prima Midah Heights

Indah Villa

Rawang Hotel

Check Our Past Project

PAST PROJECTS